208/120V Three-Phase UPS

Three-phase UPS

208/120V three-phase UPS

Three-phase UPS for buildings with 208/120V service: data rooms, clinics, labs and commercial facilities. Choose a self-contained unit (the Li90 with lithium inside, or the E91 tower) or a modular system with hot-swap power modules and N+1 redundancy.

Compare models

ModelTypeCapacityNotes
Li90Self-contained tower10-30 kWLithium batteries inside, 12.6 in wide
E91 10-20 kWTower10-20 kWSimple VRLA service model
E91 30-40 kWTower30-40 kWSimple VRLA service model
M90C-2SModular, 2-slotUp to 8 kWCompact; Eaton BladeUPS replacement
M90C-6SModular, 6-slotUp to 24 kWHot-swap modules
M90UModularUp to 60 kWHot-swap modules, N+1
M90LUModularUp to 60 kWLong runtime
M90U-80ModularUp to 80 kWUp to 16 battery modules inside
M90U-140Modular, N+1Up to 140 kWModular battery cabinet, up to 8 strings

Self-contained

One cabinet, fixed capacity: lithium inside, or a simple tower with VRLA batteries.

How to choose

If you needStart with
10-30 kW with lithium batteries inside, in a small footprintLi90
10-40 kW in a simple tower with VRLA batteriesE91
A compact modular UPS, up to 24 kWM90C
Modular with N+1, up to 60 kWM90U or M90LU
Battery modules inside the UPS cabinet, up to 80 kWM90U-80
Up to 140 kW with a modular battery cabinetM90U-140
Replacing an Eaton BladeUPSM90C-2S

Frequently asked questions

Self-contained or modular?
A self-contained UPS like the Li90 or E91 has one fixed power stage and is simplest to install. A modular UPS is built from hot-swap power modules, so it can grow in steps, carry a spare module for N+1 redundancy, and be serviced without shutting down.
What does the Li90 offer?
The Li90 puts LiFePO4 batteries inside the UPS cabinet, in 10, 20 and 30 kW models only 12.6 inches wide, with internal runtime of 15 to 45 minutes at 10 kW.
What is the M90LU?
The L stands for long runtime. Tell us the runtime you need and our engineers will size the batteries for it.
How much runtime can I get?
It depends on the model, the load and the batteries. Our engineers can size runtime for your load, from a few minutes of ride-through to an hour or more with battery cabinets.
Which models are TAA compliant?
See the TAA-compliant three-phase UPS page for the current list.