P91-10K vs Vertiv Liebert GXT5-10KHVRT5UXLN
The Xtreme Power P91-10K (paired with the BPXR3U240A pack) and Vertiv Liebert GXT5-10KHVRT5UXLN are both true online double-conversion VRLA UPS delivering full 10 kVA / 10 kW at unity PF. The P91-10K differentiates on longer baseline runtime, modular bypass/distribution, a lower rack footprint, and TAA.
What the P91-10K brings
- Longer baseline runtime (6 min vs 2 min @ 10 kW)
- Lower rack footprint (5U vs 6U)
- Optional XBDM modular bypass & distribution
- Built-in TAA compliance for federal procurement
- Scalable runtime with BPXR battery modules
Side-by-side specifications
| Specification | Xtreme Power P91-10K + BPXR3U240A | Vertiv Liebert GXT5-10KHVRT5UXLN | Advantage |
|---|---|---|---|
| UPS capacity | 10 kVA / 10 kW | 10 kVA / 10 kW | Equivalent usable power |
| Topology | Online double-conversion | Online double-conversion | Equivalent premium protection |
| Output voltage | 208/220/230/240 VAC | 208/220/230/240 VAC | Aligned voltage support |
| System runtime (full load) | 6 min @ 10 kW | 2 min @ 10 kW | P91 – longer baseline runtime |
| Optional external battery cabinets | Yes (BPXR series) | Yes (Vertiv EBCs) | Both support runtime scaling |
| Input / output architecture | Hardwired or optional XBDM modular bypass & distribution | Hardwired input only; fixed output receptacles | P91 – greater flexibility & serviceability |
| Rack height | 5U total (2U UPS + 3U battery) | 6U UPS | P91 – lower rack footprint |
| Warranty | 3-yr electronics / 3-yr battery | 3-yr electronics / 3-yr battery | Equivalent coverage |
| Compliance / listings | UL1778, cUL, FCC, CE, RoHS, TAA | UL1778, c-UL, CSA, FCC Class A | P91 – adds TAA |
| TAA compliance | Yes | No | P91 – federal procurement |
Specifications from Xtreme Power’s supplied P91-10K vs Vertiv GXT5-10KHVRT5UXLN comparison; based on publicly available manufacturer data. Both deliver full 10 kW at unity PF; the P91-10K (shown with a BPXR3U240A pack) provides longer baseline runtime in a lower 5U footprint vs the Vertiv’s 6U.
Choosing between them
Both deliver full 10 kW at unity PF with equivalent warranty. The P91-10K leads on baseline runtime, rack footprint (5U vs 6U), modular bypass/distribution, and TAA; the Vertiv HVRT suits Vertiv-standardized sites favoring a single integrated chassis.
Choose the P91-10K + BPXR3U240A if you need
- Federally funded / TAA-restricted procurement
- Longer baseline runtime without external cabinets
- Lower total rack footprint for high-density environments
- Modular bypass and power distribution (XBDM)
The Liebert GXT5-10KHVRT5UXLN may fit if you need
- A single integrated UPS chassis
- Alignment with an existing Vertiv ecosystem
- Non-TAA commercial deployments with minimal runtime needs
Related comparisons
Specifying a centralized 5-10 kVA online UPS?
Xtreme Power supports UPS selection, runtime sizing, and distributed infrastructure design across IT, networking, AV, and regulated environments.
