The Xtreme Power Li90 and the Eaton 9355 are both online double-conversion UPS for mission-critical three-phase loads in data centers, industrial, and healthcare facilities. Both provide clean power and integrated maintenance bypass — but the Li90 delivers full 20kW usable power at unity power factor, runs cooler, and installs far lighter with integrated lithium, where the 9355 derates to 18kW and uses VRLA.

Xtreme Power
Li90 (20kVA)
vs
Eaton
9355 (20kVA)
Key differentiators at a glance

Why engineers evaluate the Li90

  • Full 20kW usable power (unity power factor)
  • Lithium iron phosphate (LiFePO₄) battery technology
  • Higher efficiency with significantly lower heat output
  • Substantially lighter system weight
  • Scalable internal runtime options
  • Operation up to 50 °C (122 °F)
  • Longer battery and system warranty coverage
Side-by-side

20 kVA 208/120 V three-phase UPS comparison

FeatureXtreme Power Li90 (20kVA)Eaton 9355 (20kVA)Advantage
Rated capacity20kVA / 20kW20kVA / 18kWLi90 — full usable power (unity PF)
TopologyOnline double-conversionOnline double-conversionEqual protection
Battery technologyLithium iron phosphate (LiFePO₄)VRLA (lead-acid)Li90 — much longer life, smaller & lighter
Online efficiency / heat~94.5% / ~3,970 BTU/hr~91% / ~6,762 BTU/hrLi90 — lower cooling requirements
Internal battery runtime~15 min @ 20kW (k2) · ~22 (k3)~18 min @ 18kWLi90 — more runtime flexibility
Battery lifeUp to 15 years / 3,000–5,000 cycles~3–5 years / ~300 cyclesLi90 — dramatically fewer replacements
Maintenance bypassIntegrated (standard)Integrated (standard)Equal serviceability
Operating temperatureUp to 50 °C (derating >40 °C)Up to 45 °C (derating >40 °C)Li90 — better for hot environments
Size / weight (base battery)12.6 × 35.2 × 49.2 in / ~387 lb20 × 34 × 66 in / ~1,160 lbLi90 — significantly lighter
Battery warranty5 years (LiFePO₄)2 years (VRLA)Li90 — longer coverage
Start-up & system warrantyStart-up included; 2-year on-site (USA)1-year parts / 90-day laborLi90 — longer standard coverage

Specifications based on publicly available manufacturer data; verify against current Eaton documentation. Both are online double-conversion; the Li90 uses LiFePO₄ at unity power factor. Li90 warranty: 5-yr battery (USA; ambient ≤40 °C — 2-yr at 40–50 °C) and 2-yr on-site UPS.

Where each fits

Choosing between them

Both are online double-conversion three-phase UPS, but the Li90 delivers full usable kW at unity power factor where the 9355 derates to 0.9, runs cooler (markedly lower BTU/hr), and installs far lighter with integrated lithium — no external battery cabinets or routine VRLA replacement.

Choose the Li90 if you need

  • Full 20kW usable power in the system
  • Lithium UPS technology with long service life
  • Higher efficiency and lower thermal output
  • Flexible internal runtime options
  • Operation up to 50 °C
  • Longer battery and system warranty coverage

Choose the Eaton 9355 if you need

  • A traditional VRLA-based online UPS
  • Alignment with existing Eaton 9355 deployments
  • Standard operating conditions with controlled cooling

Plan your three-phase power architecture