10 kVA · 208/120V Three-Phase · Online Double-Conversion UPS · Eaton 9355 Comparison

E91 10 kVA vs Eaton 9355

The Xtreme Power E91 10 kVA and the Eaton 9355 10 kVA are online double-conversion UPS systems for 208/120V three-phase applications. The E91 delivers full-rated 10 kW output at unity power factor, higher operating efficiency, longer usable runtime at matched load, and a significantly smaller, lighter chassis; the Eaton 9355 provides comparable topology with reduced usable output at 9 kW in a larger, heavier cabinet.

Xtreme Power
E91 10 kVA
vs
Eaton
9355 10 kVA
Where the E91 10 kVA leads

Where the E91 10 kVA leads

  • Full 10 kVA / 10 kW usable output at unity power factor — vs the Eaton’s 9 kW.
  • Higher operating efficiency (93% vs 91% online).
  • A significantly smaller footprint and lighter weight (315 vs 373 lb).
  • Longer usable runtime at higher real load.
  • Factory start-up included as standard, plus a longer standard electronics warranty.
Side-by-side

10 kVA three-phase UPS, side by side

SpecificationXtreme Power E91 10 kVAEaton 9355 10 kVAAdvantage
Rated capacity10 kVA / 10 kW10 kVA / 9 kWFull usable output, unity PF
UPS topologyOnline double-conversionOnline double-conversionComparable premium protection
Efficiency (online)93%91%Higher efficiency, less cooling
Maintenance bypassStandard (integrated)Standard (integrated)Both integrated
Size (W × D × H)9.9 × 26.3 × 32.3 in12 × 33.5 × 32.2 inSignificantly smaller footprint
Weight (with battery)315 lb373 lbLighter system
Internal runtime11 min @ 10 kW8 min @ 9 kWMore usable runtime at higher real load
Runtime expansionExternal battery cabinetsExternal battery cabinetsComparable scalability
Warranty (electronics)2 years1-year partsLonger standard coverage
Start-up & laborFactory start-up includedStart-up optional; 90-day laborMore comprehensive standard coverage
TAA complianceTAA compliantTAA compliantEligible for federal procurement

Both are true online double-conversion three-phase UPS with integrated maintenance bypass and TAA eligibility. The E91 delivers full 10 kW usable output (vs 9 kW), higher efficiency, longer usable runtime, a smaller and lighter chassis, factory start-up, and a longer standard warranty. Confirm Eaton 9355 specifications against current Eaton documentation.

Where each fits

Choosing between them

Both deliver premium online protection, so the decision turns on usable capacity, footprint, efficiency, and ownership. Choose the E91 for full 10 kW usable output, a smaller/lighter cabinet, higher efficiency, factory start-up, and longer warranty; the 9355 fits where an existing Eaton standard governs.

Choose the E91 10 kVA if you need

  • Full 10 kW usable capacity
  • A smaller, lighter UPS footprint
  • Higher operating efficiency
  • Longer internal runtime at load
  • Factory start-up included
  • Longer standard electronics warranty

The 9355 10 kVA may fit if you need

  • Facilities standardized on Eaton infrastructure
  • Alignment with existing 9355 deployments
  • Eaton service ecosystem continuity

Standardizing compact three-phase UPS across your facilities?

Xtreme Power supports E91 three-phase UPS sizing, runtime planning with external battery cabinets, modernization strategy for legacy three-phase UPS, and TAA-compliant procurement for healthcare, education, retail, industrial, and enterprise infrastructure.