15 kVA · 208/120V Three-Phase · Online Double-Conversion UPS · Eaton 9355 Comparison

E91 15 kVA vs Eaton 9355

The Xtreme Power E91 15 kVA and the Eaton 9355 15 kVA are online double-conversion UPS systems for 208/120V three-phase applications. The E91 delivers full 15 kW output at unity power factor, higher efficiency, and a smaller, lighter cabinet; the Eaton 9355 provides comparable topology but reduced usable output at 13.5 kW in a larger, heavier chassis.

Xtreme Power
E91 15 kVA
vs
Eaton
9355 15 kVA
Where the E91 15 kVA leads

Where the E91 15 kVA leads

  • Full 15 kVA / 15 kW usable output at unity power factor — vs the Eaton’s 13.5 kW.
  • Higher operating efficiency (94% vs 91% online).
  • A smaller vertical footprint and significantly lighter weight (504 vs 609 lb).
  • Factory start-up included as standard, plus a longer standard electronics warranty.
Side-by-side

15 kVA three-phase UPS, side by side

SpecificationXtreme Power E91 15 kVAEaton 9355 15 kVAAdvantage
Rated capacity15 kVA / 15 kW15 kVA / 13.5 kWFull real-power output, unity PF
Output power factor1.00.9More usable kW from same kVA
UPS topologyOnline double-conversionOnline double-conversionComparable protection
Efficiency (online)94%91%Higher efficiency, less cooling
Maintenance bypassStandard (integrated)Standard (integrated)Both integrated
Size (W × D × H)11.9 × 34 × 40.2 in12 × 33.5 × 47.8 inSmaller vertical footprint
Weight (with batteries)504 lb609 lbSignificantly lighter
Internal runtime11 min @ 15 kW13 min @ 13.5 kWEaton longer, but at 13.5 kW
Runtime expansionExternal battery cabinetsExternal battery cabinetsComparable scalability
Warranty (electronics)2 years1-year partsLonger standard coverage
Start-up & laborFactory start-up includedStart-up optional; 90-day laborLower deployment cost
TAA complianceTAA compliantTAA compliantEligible for federal procurement

Both are true online double-conversion three-phase UPS with integrated bypass and TAA eligibility. The E91 delivers full 15 kW usable output (vs 13.5 kW), higher efficiency, a smaller and lighter cabinet, factory start-up, and a longer warranty. The Eaton shows slightly more raw runtime minutes, but at its reduced 13.5 kW output. Confirm Eaton 9355 specifications against current Eaton documentation.

Where each fits

Choosing between them

Choose the E91 for full 15 kW usable output, higher efficiency, a smaller/lighter cabinet, factory start-up, and longer warranty; the 9355 fits where an existing Eaton standard governs.

Choose the E91 15 kVA if you need

  • Full 15 kW usable capacity
  • A smaller and lighter UPS footprint
  • Higher operating efficiency
  • Runtime at full rated load
  • Factory start-up included
  • Longer standard electronics warranty

The 9355 15 kVA may fit if you need

  • Facilities standardized on Eaton infrastructure
  • Alignment with existing 9355 deployments
  • Eaton service ecosystem continuity

Standardizing compact three-phase UPS across your facilities?

Xtreme Power supports E91 three-phase UPS sizing, runtime planning with external battery cabinets, modernization strategy for legacy three-phase UPS, and TAA-compliant procurement for healthcare, education, retail, industrial, and enterprise infrastructure.